Commissioning of the finished paint application system at Elektror GmbH in Waghäusel |
|
The project for the aviation industry was successfully completed! |
|
New foreign trade representative in Russia with the SAT company (Moscow). |
|
Jürgen Schubert (sales department) has retired. |
|
Ground-breaking ceremony at Elektror in Waghäusel |
|
Economical and flexible – the new coating system at the Gerstlauer company |
|
The combination of powder coating and wet paint coating |
|
One of our most senior employees has retired |
|
JOT Live, symposium for industrial wet painting |
|
HEIMER paint application systems at the Paint Expo 2012 in Karlsruhe |
|
Painting of axle carriers – no chance for rust |
|
Dry or wet separation? A comparison of investment and operating costs |
|
Heimer – NEW waste air treatment process with a catalyst and OZONE |
|
The Heimer extraction wall with filter mat extraction units to extend the filter life |
|
The Heimer paint application system at the GEA AWP company in Prenzlau |
|
The Heimer paint application system at the Vetter company in Haiger |
|
Heimer brings more colour into play |
|
Robot line tracking: |
|
The new Heimer open-area paint application system was commissioned at the oldest German rotating tower crane manufacturer |
|
Heimer opens a new business location in Fulda |
|
Two rubber profile coating systems in a building block container system were delivered and commissioned |
|
The largest combined painting and drying cubicle for the best paint finishes starts working in triple-shift operation at a well-known excavator manufacturer. |
|
40,000 plastic components for vehicle interior trim and upholstery are painted daily using the two Heimer systems working in triple-shift operation. |
|
A furniture manufacturer exchanges the old paint application system with wet scrubbing for a system with dry separation. |